Skip to contentSaltar al contenidoAle nan kontni anПерейти к содержимомуדלג לתוכן
EstateDraftFL

Changelog

What shipped — dated, typed, real

This page is generated from the repository's actual commit history — 917 shipped changes since June 2026, none written for marketing. Snapshot date: 2026-10-07.

October 2026

  • FixedThe certification program, Phase 1 — everything connected: no link to nothing, a screen for every route, access codes, a conflict undo, a plan's answers changed, and an outage called one (UA-101 to UA-107)2026-10-07
  • FixedThe certification program, Phase 0 — the Feature Register and the staging bed, one return-path rule after a second-factor redirect, and two releases restored to the changelog (UA-001 to UA-010)2026-10-06
  • NewIntake and interface upgrade, Phase U9 — the side-by-side proof of the sixteen reference screens, and their public demo on sample data (closes the 25th audit's M6 and L16)2026-10-06
  • FixedAudit 2026-10-05 fix program, Release B — the dependency updates adopted, source-map-js 1.2.2 for the advisory that stopped Release A's promote, and Release A's records (M4)2026-10-06
  • FixedAudit 2026-10-05 fix program, Phase 1 — the intake's files kept, thirty-eight statute rows corrected, one same-origin rule, and a statute sweep that comes round in three weeks (H1, H2, M1–M4, L1–L8, L10, L13, L14)2026-10-05
  • NewIntake and interface upgrade, Phase U8 — every other firm destination in the new frame2026-10-05
  • NewIntake and interface upgrade, Phase U7 — the Drafting desk2026-10-05
  • NewIntake and interface upgrade, Phase U6 — Attorney review & decisions2026-10-05
  • NewIntake and interface upgrade, Phase U5 — the Matter command center2026-10-05
  • NewIntake and interface upgrade, Phase U4 — the firm's Overview & chat, Clients & matters and Saved conversations2026-10-04
  • NewIntake and interface upgrade, Phase U3 — My Estate Desk, and the questionnaire in the intake's frame2026-10-04
  • NewIntake and interface upgrade, Phase U2 — the six-step client intake, sent as a screened consult request2026-10-04
  • NewIntake and interface upgrade, Phase U1 — the new frame for the firm console and the customer's account2026-10-04
  • NewMaster plan (2026-09-24), Phase 21 close-out — the last phase's release records, the firm sign-in in the axe census, a steadier tour check2026-10-04
  • NewMaster plan (2026-09-24), Phase 21 — the optional expansion as the owner decided: the dispute preparation pack, single sign-on and the deprovisioning door, the native app, accounting software (M-2101…M-2104)2026-10-03
  • NewMaster plan (2026-09-24), Phase 20 — release with evidence, the ledgers closed, change governed, and the 2026-10-03 audit's fixes (M-2001…M-2004)2026-10-03
  • NewMaster plan (2026-09-24), Phase 19 — validation beyond code checks (M-1901…M-1904)2026-10-03
  • NewMaster plan (2026-09-24), Phase 18 — performance, reliability, recovery and security operations (M-1801…M-1804)2026-10-03
  • NewMaster plan (2026-09-24), Phase 17 — buyer experience, evidence pages and marketing chrome (M-1701…M-1706)2026-10-02
  • NewMaster plan (2026-09-24), Phase 16 — the consumer lane, deterministic only: purchases understood, finished and kept (M-1601…M-1606)2026-10-02
  • NewMaster plan (2026-09-24), Phase 15 — beyond the browser: Word that edits, Outlook that checks at compose time, a phone-safe PWA, Clio completed, e-signature scoped (M-1501…M-1507)2026-10-02
  • NewMaster plan (2026-09-24), Phase 14 — the platform: scoped keys, honest pages, OpenAPI, signed webhooks, a governed MCP server (M-1401…M-1406)2026-10-01
  • NewMaster plan (2026-09-24), Phase 13 — the firm's playbook, the estate-plan brief, review as an explicit operation, and the handoff to the administration (M-1301, M-1304)2026-10-01
  • NewMaster plan (2026-09-24), Phase 13 part 5 — funding as evidence: each asset's way into the trust, its standing read from evidence with its basis (M-1303)2026-10-01
  • NewMaster plan (2026-09-24), Phase 13 part 4 — execution evidence: a signing pinned to the approved version, completed only on its evidence (M-1302)2026-10-01
  • Proofa feature test's accessibility scan covers the sections it reads — the census keeps the whole page2026-10-01
  • NewMaster plan (2026-09-24), Phase 13 part 3 — statements frozen when they are executed (M-1307)2026-10-01

September 2026

  • NewMaster plan (2026-09-24), Phase 13 part 2 — two attorneys for a large outflow (M-1306)2026-09-30
  • NewMaster plan (2026-09-24), Phase 13 part 1 — the trust's ledger reconciled three ways (M-1305)2026-09-30
  • NewMaster plan (2026-09-24), Phase 12 part 4 — the silence sweep and the trustee's "why this date" (M-1205, M-1206)2026-09-30
  • SecurityNext.js 16.3.8 — the framework's security release; the gate reads a placeholder fix from the release notes2026-09-30
  • NewMaster plan (2026-09-24), Phase 12 part 3 — drift, and the connected calendar bound to confirmed dates (M-1204)2026-09-30
  • NewMaster plan (2026-09-24), Phase 12 part 2 — two lanes: a proposed date and a calendared one (M-1203)2026-09-30
  • NewMaster plan (2026-09-24), Phase 12 part 1 — every computed date carries its derivation (M-1201, M-1202)2026-09-30
  • Fixeda person's own words align the way their surroundings do — centred text stays centred on a Hebrew page2026-09-30
  • Fixeda firm can invite a co-client, and a person's own words keep their own direction on a Hebrew page2026-09-30
  • NewMaster plan (2026-09-24), Phase 11 part 4 — two clients on one matter stay two clients (M-1105)2026-09-30
  • NewMaster plan (2026-09-24), Phase 11 part 3 — a share's link gives exactly the version that was shared (M-1103)2026-09-29
  • NewMaster plan (2026-09-24), Phase 11 part 2 — decisions answered once, and where things stand in the attorney's own words (M-1102, M-1106)2026-09-29
  • NewMaster plan (2026-09-24), Phase 11 part 1 — document requests with three honest answers, and every upload's honest state (M-1101, M-1104)2026-09-29
  • NewMaster plan (2026-09-24), Phase 10D — Firm control: engines per surface, the house voice, and the firm's switches with their record (M-1004)2026-09-29
  • NewMaster plan (2026-09-24), Phase 10C — the matter's exports checked against an inventory of what the platform holds (M-1003, part 4b-2)2026-09-28
  • NewMaster plan (2026-09-24), Phase 10C — a referral carries the client's recorded consent and a fresh sign-in (M-1003, part 4b-1)2026-09-28
  • NewMaster plan (2026-09-24), Phase 10C — part 4a close-out: the person's list offers only the firms they may ask (M-1003)2026-09-28
  • NewMaster plan (2026-09-24), Phase 10C — deletion requests: a firm's client asks, and the firm answers on the record (M-1003, part 4a of 4)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 9 — the framework's own critical fix, and an audit that reads the framework's own advisories (N5, #310)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 8 — the statute radar that could not record most of the corpus, and the bell that hid it (N3, N4)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 7 — the development toolchain's pending updates, adopted by the house path (L9, #311)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 6 — the advisor's warnings, the armed domain checks, a page's own language, and the repository's loose ends (L8, L4, L9, N2)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 5 — honest 404s, honest failures, and two end-to-end reads that raced (L1, L2, L5, L6)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 4 — English marked as English, and a demonstration firm that promises no one (M5, L7)2026-09-28
  • FixedAudit 2026-09-27 fix program, Phase 3 — the document parser without its known denial of service (M4)2026-09-27
  • FixedAudit 2026-09-27 fix program, Phase 2 — the staff second factor, held by the database (H1)2026-09-27
  • FixedAudit 2026-09-27 fix program, Phase 1 — the reads the database refused, and the operator's signals (M1, M2, M3, L3, N1)2026-09-27
  • NewMaster plan (2026-09-24), Phase 10C — retention: a firm's policy, deletion with a receipt, and the conflict history kept (M-1003, part 3 of 4)2026-09-27
  • NewMaster plan (2026-09-24), Phase 10C — the nightly file backup keeps real files, and lets deleted ones go (M-1003, part 3 prerequisite)2026-09-27
  • NewMaster plan (2026-09-24), Phase 10C — the record's lifecycle: closed, archived and read-only (M-1003, part 2 of 4)2026-09-27
  • NewMaster plan (2026-09-24), Phase 10C — part 1 close-out: counts in the right words, and the sweep proven live (M-1003)2026-09-27
  • NewMaster plan (2026-09-24), Phase 10C — the Records counts read through the right door (M-1003, part 1 follow-up)2026-09-27
  • NewMaster plan (2026-09-24), Phase 10C — legal holds, and deletion that reaches every stored file (M-1003, part 1 of 3)2026-09-26
  • NewMaster plan (2026-09-24), Phase 10B — a member of the firm is never the client side (M-1002 follow-up)2026-09-26
  • NewMaster plan (2026-09-24), Phase 10B — disclosure classes (M-1002)2026-09-26
  • NewMaster plan (2026-09-24), Phase 10A — matter teams and ethical walls (M-1001)2026-09-26
  • NewMaster plan (2026-09-24), Phase 9 — conflicts, intake and the consult door (M-901…M-907)2026-09-26
  • NewMaster plan (2026-09-24), Phase 8 — the unified workbench, revision memory, role-appropriate chrome (M-801…M-804)2026-09-25
  • NewMaster plan (2026-09-24), Phase 7 — the matter brain v2: sources, propositions, coverage and change impact (M-701…M-706)2026-09-25
  • NewMaster plan (2026-09-24), Phase 6 — the record proves itself: chains, signatures, anchors, manifests, offline verifier, packets, hand-over (M-601…M-607)2026-09-25
  • NewMaster plan (2026-09-24), Phase 5 — approvals bound to the exact revision; approved delivery separate from working copies (M-501…M-506)2026-09-25
  • NewMaster plan (2026-09-24), Phase 4 — the Firm Day v2 and the unified agenda (M-401…M-407)2026-09-24
  • NewMaster plan (2026-09-24), Phase 3 — durable work, honest status, a common outbox, additive schema law (M-301…M-304)2026-09-24
  • NewMaster plan (2026-09-24), Phase 2 — publish the boundary: capabilities, limits, refusals, sub-processors (M-201…M-206)2026-09-24
  • NewMaster plan (2026-09-24), Phase 1 — workspace input and matter context you can trust (M-101…M-107)2026-09-24
  • NewMaster plan (2026-09-24), Phase 0 — baseline, live fixes and integrity defects (M-001…M-013)2026-09-24
  • Docsclose out the purchasability program — the release row and header for dpl_6ytLdGPStGWvjsLAuvoo311CZUF9 @ 04a163e6 and the served changelog entry2026-09-19
  • Newthe firm platform tiers are purchasable online — Square subscription checkout, renewal sync and self-serve cancel; every /firms/pricing tier card opens the firm signup (owner order 2026-09-19: everything purchasable)2026-09-19
  • Docsclose out the 22nd-audit fix program — the Phase 7 row and header (dpl_8Nz5u2kuqCBwGF2jmU7TgCkm71sW @ 85e56176) and Phase 6's +1 h runtime check2026-09-19
  • Fixedthe unbuyable membership leaves six pages and the unattested TrusteeClear benefit leaves the tiers until the owner attests; the dated records brought current (22nd audit M2, M3, L5, L7, L9, L10, L25, L28)2026-09-18
  • Fixedevery JSON body read through the bounded reader (89 routes); create-firm slugs must be firm host labels; the last firm admin cannot be removed; only a pending transfer can be accepted (22nd audit L1, L2, L3, L4)2026-09-18
  • Fixedevery form control carries an accessible name — 111 placeholder-only or nameless inputs, textareas and selects named across 47 console and portal files; the guard that keeps it so (22nd audit L17)2026-09-18
  • Fixedone platform credit; prices from the schedule; the palette and reminder card localized; readiness check unscored; real-firm referrals only (22nd audit L15, L16, L19, L21, L22, L24)2026-09-18
  • Fixedthe freshness sweep records an explicit verdict for a row it cannot verify; the four Online-Sunshine statute rows re-pointed to the Florida Senate and 740.006 reloaded from the current text (22nd audit M1)2026-09-18
  • Fixedthe solo trustee before-you-act step is recorded, never under review; the closeout binder, task chip and phase lesson read for the solo lane (22nd audit M4, L23, L20, L12)2026-09-18
  • Docsrecord the Chapter 709 completion promote (dpl_2deSX2SHtV9RfZKcu2LwJyCjCpT8 @ f1c9166b)2026-09-15
  • Fixedcomplete Chapter 709 — add Part I, the six powers-of-appointment sections 709.02–709.07 (owner statute audit 2026-09-15, part 2)2026-09-15
  • Docsrecord the corpus-completion promote (dpl_4seopNh6F8oKT8Vh56LmLyXkL5a2 @ 697c8844)2026-09-15
  • Fixedadd ten Florida Statutes sections the July seed omitted from Chapters 732 and 736; live-index coverage guard (owner statute audit 2026-09-15)2026-09-15
  • Docs21st audit fix program close-out — convergence, governance and ledger records, operational status, the Phase 8 row and the missing #253 receipt (21st audit N-2, N-3, N-8; N-9 list)2026-09-14
  • Fixedhuman labels for 92 court-form fields curated from the rendered pages; 13 stray, duplicate or wet-ink widgets unmapped; label guard hardened (21st audit L-J); release row for the Phase 7 promote2026-09-14
  • Fixedthe carried Lows — Lady Bird claim narrowed, Role Check drops scores and severity, one operating-company constant, couples-plan disclosure, staff-lane review gating, report-PDF notice, engine band vocabulary (21st audit L-A/C/E/F/H/I/K/O/P/Q/R); release row for the Phase 6 promote2026-09-14
  • Fixedcorpus-freshness degrades instead of failing on a publisher blip; admin plan page designed error state; attestation subtitle; dead sealed policies dropped + private FK indexes (21st audit N-4/N-5/N-6/N-7/N-11)2026-09-14
  • Fixedpour-over lander names both guardian instruments; /documents hero sub-line meets AA contrast; release row for the Phases 1–2 promote (21st audit M-A, M-B)2026-09-14
  • Fixedprobate receipt no longer promises an attorney review; the single-document lane honors the Florida release flag (21st audit M-D, M-C)2026-09-14
  • Fixedsolo trustee portal names no firm and has no dead doors — audience-aware panels, self-published updates, trustee-answered requests (21st audit H1)2026-09-14
  • Docsreconcile live audit fixes and verified commit signatures2026-09-13
  • Newsurface direct document links with verified release history2026-09-13
  • Fixedbound request intake and sanitize diagnostic evidence2026-09-13
  • Fixedverify complete inventories and independent restore targets2026-09-13
  • Fixedpreserve text and structure with recoverable downloads2026-09-13
  • Docsanchor the changelog to merged main history2026-09-12
  • Fixedclarify plan pricing and questionnaire feedback2026-09-12
  • Fixedvalidate scanning and firm-host readiness2026-09-12
  • Fixedselect verified legal editions consistently2026-09-12
  • Fixedcommit exact generations and approvals atomically2026-09-12
  • Fixedenforce staff MFA and require complete CI evidence2026-09-12
  • Fixedkeep professional review identities offline2026-09-12
  • Fixedseparate consumer packet checks from attorney analysis2026-09-12
  • DocsSEO + GEO program close-out — the Phase 4 ledger row + header for dpl_J1uvAW1HN3vjyD35gVv6D9L14CPi @ bb649739 (deploy-neutral)2026-09-10
  • NewPhase 4 — authority: the press kit, the brand mark, the schema logo + contact point, the citation block, the owner outreach guide (SEO program 2026-09-09)2026-09-10
  • NewPhase 3 — the static home + the three-page word top-up (SEO program 2026-09-09)2026-09-10
  • NewPhase 2c — the eight money pages deepened + the footer Documents column (SEO program 2026-09-09)2026-09-10
  • NewPhase 2b — the Lady Bird pillar + the comparison hub (SEO program 2026-09-09)2026-09-10
  • NewPhase 1 completed on every URL + Phase 2a — six per-document landers and two package pages (SEO program 2026-09-09)2026-09-09
  • NewSearch Console and Bing verification from env, the click-by-click owner discovery guide, titles and descriptions within the SERP limits on 24 pages, keyword-bearing H1s, the Lady Bird pages differentiated, WebApplication and OfferCatalog schema (SEO program 2026-09-09, Phases 0–1)2026-09-09
  • Docs2026-09-09 fix program close-out — the Phase 3 ledger row for dpl_1Tc88m5PDS8Egf3b5fQKPavCBb1t @ 92eebae1 and the header; the CI install steps retry the runner's apt mirror (the program closed out)2026-09-09
  • Fixedthe 19th audit's Lows — the deterministic lane never model-gated, the consent IP, the firm-lane register, the self-review's audit row, the corpus sweep's truth, the demo door, two consumer claims, a dead module, the records (2026-09-09 fix program, Phase 3)2026-09-09
  • Fixedthe purchase facts name what the consumer lane delivers; no contract execution line on an estate instrument; the firm's draft self-review has a reader (2026-09-09 fix program, Phase 2 — M1 + M2 + M3)2026-09-09
  • Fixedthe solo trustee portal and beneficiary view name no firm; the reminders cron never runs the model for the direct tenant (2026-09-09 fix program, Phase 1 — H1 + H2)2026-09-09
  • Docs2026-09-08 fix program final close-out — the Dependabot-tail ledger row for dpl_Ahs8KRc8Df4NzbEWS3mHBKSGkuR8 @ 23a1dd47 and the header (deploy-neutral)2026-09-08
  • Fixedthe changelog-freshness guard counts only the commits the generator lists — a Dependabot merge is never a forgotten release (2026-09-08 fix program, L13)2026-09-08
  • Docs2026-09-08 fix program close-out — the Phase 5 ledger row for dpl_9NmUuZrdRw5nkmJYdfpzxU2gzcNe @ 2a04b675 and the header; the program closed out (deploy-neutral)2026-09-08
  • Docsthe changelog regenerated after the Phase 5 merge — the generator skips ci: commits, the freshness guard counts them (2026-09-08 fix program)2026-09-08
  • Fixedestatedraftfl.ai is served by this team's own Vercel project and the records say so; /security and the footer say what is true; the platform's name and domain on the firm-team and receipts surfaces; the management token from the secrets file (18th audit H1 records, Lows 4-6, 9, 10, 12, 13)2026-09-08
  • Fixeda signed Square event for a payment this account cannot see is acknowledged and raised, not answered 500 and retried; the mail, auth, and promotion records say what is live (18th audit M1, M2, M3)2026-09-08
  • Fixedevery Florida instrument states its own execution rule; the will pack's no-contest note and the deed's homestead citations corrected (18th audit M5, L3, L11)2026-09-08
  • Fixedevery consumer surface says what the platform does — no review, no verdict, no retired product; the guards scan the other word orders; the July-1 sentences in the past tense; relabeled buttons open their own door (18th audit H3, M6)2026-09-08
  • Fixedthe direct-tenant trustee portal runs no model — /api/extract refuses the consumer tenant; the organization, observation, and vault doors follow (18th audit H2, M4)2026-09-08
  • Docsrecord the 2026-09-08 owner-directed env-arming promote (867f6f1a) that armed platform mail (deploy-neutral)2026-09-08
  • Docsthe owner guide's allow-list step is now the Supabase dashboard (no terminal), on owner feedback (deploy-neutral)2026-09-08
  • Docs2026-09-08 — the four T+24h ledger entries from fresh evidence and the owner go-live guide re-issued click-by-click (deploy-neutral)2026-09-08
  • Docs2026-09-07 fix program Phase 4 close-out records — the ledger row for dpl_EuPaZrYBKPXiFQtxCGuLKiFmYxBP @ cb21151e and the header; the program closed out (deploy-neutral)2026-09-07
  • Fixed2026-09-07 fix program Phase 4 — the Lows: the second-factor door in the accessibility harness and the surface inventory regenerated with its corrected command, the env-provenance rows, the superseded hand-off document, the living counts, the accepted advisor set, the configurable security-notice contact, the on-demand weekly sweep, the Node 22 mirror gate, a bounded browser install and bounded live probes, and the owner go-live guide (the 17th audit's L1–L2, L4–L9, L11; L13–L14)2026-09-07
  • Docs2026-09-07 fix program Phase 3 close-out records — the ledger row for dpl_8w6ksyE9n6dkJYPGkpCdVSKe2Cno @ ab22dc7e and the header (deploy-neutral)2026-09-07
  • Fixed2026-09-07 fix program Phase 3 — the second-factor wall covers the probate Opposing Counsel Pass and the guard enumerates every lane route that authorizes staff (the 17th audit's M2)2026-09-07
  • Docs2026-09-07 fix program Phase 2 close-out records — the ledger row for dpl_B3KQCxqTryUtZYLMcJKrJRpFPcVE @ d0c516be and the header (deploy-neutral)2026-09-07
  • Fixed2026-09-07 fix program Phase 2 — the retry backoff repaired in both job ledgers (GREATEST(NULL) never reached the exponential branch; one pure delay helper, asserted at apply time on both databases) and H7 Run 18 on both projects after six unrun policy migrations (the 17th audit's M1 and M3)2026-09-07
  • Docs2026-09-07 fix program Phase 1 close-out records — the ledger row for dpl_79epDPVL6YLSMsCahLaFBbfXMTbu @ d7d8d5cf, the header, and the storage-backup evidence (deploy-neutral)2026-09-07
  • Fixedthe nightly storage backup lists its objects through a service-only function in the exposed schema, and every cron heartbeat carries the run's verdict so a failed run pages as cron.failed — 2026-09-07 fix program, Phase 1 (the 17th audit's H1: every production backup run since 2026-09-05 had failed on the unexposed storage schema behind a healthy-looking heartbeat)2026-09-07
  • Docs2026-09-05 program Phase J close-out records — the ledger row for dpl_85MVgJtbbEugUiENRxwC4PLgLyVg @ ba58befa and the program record's Shipped-as; the program's ten phases live (deploy-neutral)2026-09-06
  • New2026-09-05 program Phase J — the ops watch that pages every critical alert (the stuck-jobs synthetic), changelog freshness in CI, the log-drain and alert routing with the HEALTH_TOKEN read-only health bearer, and the security-notice routing with the sealed-recipient erasure notice (owner order 2026-09-05)2026-09-06
  • Docs2026-09-05 program Phase I close-out records — the ledger row for dpl_5AHKoPxooJGaM37JHS2nrszYvQTx @ f4540dd and the program record's Shipped-as (deploy-neutral)2026-09-05
  • New2026-09-05 program Phase I — the durable account-erasure job, the JSON body conversions to zero, the typed database boundary (looseDb retired to zero, guard-pinned), the cron roster derived from vercel.json (the evening audit's M1), the second-factor wall's full scope (the afternoon audit's M2), and the convergence record re-run (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase H close-out records — the ledger row for dpl_2bJuKfyn6AG418DAcX4ZAbAFwFA5 @ fd377a0 and the program record's Shipped-as; the changelog dated in one time zone (the evening audit's L10)2026-09-05
  • New2026-09-05 program Phase H — the 390 px chooser above the fold (the page's sections re-ordered on phones, the desktop hero unchanged, the mobile pixel baseline re-rendered) and the tagged-PDF evaluation asking the owner for the route; two ledger cells caught up (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase G close-out records — the ledger row for dpl_2YAsVYS9KgpoXZocqbNSyWukWKAz @ 2cb2da1 and the program record's Shipped-as (deploy-neutral)2026-09-05
  • Docs2026-09-05 program Phase G — the counsel review packet: what counsel decides (F-16–F-19, the outcome sentences, the date-kind semantics), every ledger indexed, and the eight-scenario representative outputs rendered by the shipped templates from the scenarios' own answers, hash-pinned and guard-kept fresh; the 2026-09-05 audit's M1 fixed before merge (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase F close-out records — the ledger row for dpl_33k6KUdBP8geLxLVVSVuzhCcPBMs @ 4f2b1cc and the program record's Shipped-as (deploy-neutral)2026-09-05
  • Upkeep2026-09-05 program Phase F — the advisory freshness stamp as a promote gate, the CI browser cache, the staged toolchain upgrade (Vitest 5 adopted; ESLint 10 blocked by the bundled react plugin), the TypeScript 7 note, the Node 24 plan, and the recorded GHAS/reviewer/replay decisions (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase E close-out records — the ledger row for dpl_HQLocbFj1URZxqJqe3ckSg32p7rh @ fea3b1b and the program record's Shipped-as (deploy-neutral)2026-09-05
  • Docs2026-09-05 program Phase E — the 81-scenario acceptance matrix with honest status and evidence, the availability register generated from the claims, offers, refusals, and pricing (the TrusteeClear line resolved as owner-fulfilled with its evidence open and the mechanism stated), the commerce harness with an honest sandbox skip (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase D close-out records — the ledger row for dpl_92VQYeCGkuf4o3EGyX71kBmhSocD @ 8d5864a and the program record's Shipped-as (deploy-neutral)2026-09-05
  • New2026-09-05 program Phase D — the nightly storage-object backup with content-addressed copies, a hashed manifest, retention, and the recorded-hash cross-check; the restore drill script and its doc; the storage-backups bucket on both databases (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase C close-out records — the ledger row for dpl_5sdGHicXhQ2ibPi96ifUHUCiPhkB @ cf5d00c and the program record's Shipped-as (deploy-neutral)2026-09-05
  • New2026-09-05 program Phase C — a second factor on every staff surface, decided once in the proxy (step-up and enrollment doors; the sandbox, demo, and onboarding exemptions), and the sign-in doors' captcha token pass-through behind the owner's site key (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase B close-out records — the ledger row for dpl_Bthp3tW4ECqt1UFXE4qQ5Vng5TJ8 @ b3f2e96 and the program record's Shipped-as (deploy-neutral)2026-09-05
  • Faster2026-09-05 program Phase B — the dictionary split: the five-locale dictionary stays server-side, every client-reachable module renders from its own generated strings, the home page's script payload falls from 577 KB to 210 KB compressed, the browser budgets ratcheted to the measured values (owner order 2026-09-05)2026-09-05
  • Docs2026-09-05 program Phase A close-out records — the ledger row for dpl_2XK1iZRJaxongt3Jah5F1hhnCrhE @ d368b41 and the program record's Shipped-as (deploy-neutral)2026-09-05
  • Fixed2026-09-05 program Phase A — one release decision that refuses on an unreadable source-lock row, audit and erasure writes that read their results, bounds-checked document parsing, validated JSON at the public routes, the consumer wording in five locales, tiered pricing entry with no preselection, the provenance claim behind the registry, the register's date kinds, the two ratchets (owner order 2026-09-05)2026-09-05
  • Docsaudit 2026-09-04 (evening) fix program close-out records — the ledger row for dpl_f5oTkyvhFtqK1oaH7XzfWfKroccN @ 17210a3 and the record's Shipped-as (deploy-neutral)2026-09-04
  • Fixedaudit 2026-09-04 (evening) — the six Lows closed: the firm-attestation revocation is service-only with the actor from the route (the first advisor WARN since 08-16 cleared), the insert policy in the initplan form with its guard, the user_id index, the flag read after authorization, the convergence record re-run, the Node 22 pin enforced (owner order 2026-09-04)2026-09-04
  • DocsUPL v3 Phase 10 close-out records — the ledger row for dpl_7YrtskgouMAiQf1Ecc2rLu8TvddC @ ce19046 and the program doc's final Shipped-as (deploy-neutral)2026-09-04
  • NewUPL v3 Phase 10 — governance: an owner per surface over the route registry, the guards on every pull request, classification before change in the PR template, the authority register with effective dates, the quarterly re-reads, findings reopened when assumptions change (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 9 — validation and release: the executed scenario matrix, the deed rungs and five locales in a real browser, the failure ledger with every Critical and High disposition, the observation tied to the SHA; the probate guide's verdict sentence closed (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 8 — Rule 5.030 stated by effective date from the SC2025-1478 opinion on every surface; official-form provenance per form and the transcription audit that retires three answer-altering transforms (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 7 — attorney lane integrity: typed agent approvals + the agent_runs staff write boundary, the firm attestation v1 framework (dark until counsel's text), the release ceremony scoped to what is reviewed; the Phase 6 locale follow-through (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 6 — copy and claims: the substitute sentence on every consumer product page in five locales, the desk footnote, the terms clause made true, the doctrine names renamed, the provenance guard2026-09-04
  • NewUPL v3 Phase 5 — the deed's two rungs re-shaped: the customer's own execution before a commissioned Florida online notary and two witnesses, a ministerial e-recording as executed, no supervision, no review, no guarantee (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 4 PR B — the consumer probate lane elects its path: general rules for every path, the elected path's filing set from the answers, general-law notes instead of a risk register, the customer's own Rule 5.030 statement (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 4 PR A — consumer conclusions off: general-law triage, HomesteadClear rule panels, the checker's arithmetic, Matter Agents refused for consumers with a deterministic TrustFundingFix (owner order 2026-09-03)2026-09-04
  • NewUPL v3 Phase 3 PR B — the clause ledger traced by execution, ten bracketed blanks where an election was inferred or defaulted, format-only validation pinned, document states named (owner order 2026-09-03)2026-09-04
  • Docsrecord the Phase 5 promote of the 2026-09-04 fix program (dpl_B7hrngUo @ dfae24d)2026-09-04
  • UpkeepPhase 5 — the management token out of the synced env file, the program's record, and the Phase 4 ledger row2026-09-04
  • Fixedthe deterministic lanes, the statute card, the gated-AI wording, the pre-pay consent, and the election agreement v3 (Phase 4)2026-09-04
  • Fixedthe site-wide review claims, the AR-1 guard blind spot, and the stale documents (Phase 3)2026-09-04
  • Fixedthe live consumer claims the 2026-09-04 audit found — pricing facts, the probate landing page, the probate footer ×5 (Phase 2)2026-09-04
  • Newv3 Phase 3A — template defaults become the customer's elections2026-09-04
  • Docsrecord the UPL v3 Phase 2 close-out promote (dpl_E3SPLt3v @ 5aabf6f)2026-09-03
  • DocsUPL v3 Phase 2 close-out — ledger rows for dpl_C8dKuP3r and dpl_2PfaVDjd, changelog 719 -> 723, Phase 2 marked shipped2026-09-03
  • Fixedthe consumer review claims the Phase 2 probes found — footer disclaimer in five languages, the dark attorney-review page, the probate OG line, the manifest2026-09-03
  • NewUPL Program v3 Phase 2 — the questionnaire audit and fix: elections instead of defaults, no recommendation, every answer verbatim (owner order 2026-09-03)2026-09-03
  • Docsrecord the UPL v3 Phase 1 close-out promote (dpl_9uyfb2Rm @ a50bcac)2026-09-03
  • DocsUPL v3 Phase 1 close-out — ledger rows for dpl_2WBVaEsf and dpl_58mstkWE, changelog 715 -> 719, Phase 1 marked shipped2026-09-03
  • FixedPhase 1 follow-through — the labels the live probes found; the trustee page sells the deterministic path2026-09-03
  • NewUPL Program v3 Phase 1 — consumer AI off, attorney lane untouched (owner order 2026-09-03)2026-09-03
  • Docsrecord the AR-1 changelog promote (dpl_BxeuWyk8 @ 63a48e3)2026-09-03
  • DocsAR-1 ledger row + changelog 713 -> 715 (PR #126 promoted as dpl_J19NHjms)2026-09-03
  • NewAR-1 — remove every attorney-review / approval / oversight claim; firm approval is per-person (owner order 2026-09-03)2026-09-03
  • Docsgo-live fix program close-out — documentation truths, changelog 713, ledger rows, Phase 12 evidence (audit L15/L19 — Phase 5)2026-09-03
  • Upkeepdead code retired, xmldom advisory closed, sweep concurrency, line-ending law (audit L4/L9/L10/L8/L11 — Phase 4)2026-09-03
  • Newcontrol-border law closed, inline signatures, server-owned dual approval, matter rail unified, BOMs gone (audit M3/L17/L1/L2/L3 — Phase 3)2026-09-03
  • Newthe /contact door, honest /status, and four evidence truths (audit L7/M4/L6/L13/L14 — Phase 2)2026-09-02
  • Newself-serve duties packet, firm attestation, honest firm picker (audit M1/M2/L18 — Phase 1)2026-09-02
  • Docsfix-program close-out — Phase 12 T+24h entry, Phase 3/4 ledger rows, changelog 7082026-09-02
  • Newhourly sandbox TTL sweep with heartbeat + 403 wall (audit L3)2026-09-02
  • Fixedexecutable env provenance + orphaned homepage code removed (audit L1/L4/L5)2026-09-02
  • Fixedregister the five pages that lived outside the route registry (audit M1)2026-09-02
  • Docsfinal hand-off truth — ledger through #112, changelog 7042026-09-01
  • Docsthe 2026-09-01 hand-off and master onboarding prompt2026-09-01
  • Docsrecord the design audit and its two composition releases2026-09-01
  • Newrestore the Opposing Counsel Pass demo + Attorney Workspace bands2026-09-01
  • Fixedthe console tour rides with the TrusteeClear module band2026-09-01